Some might describe this project as...unique, extremely solid, unconventional, some have called it 'industrial...certainly engaging with lots of flavor. Needless to say, everyone is learning a lot on this project.
The joists represent the project poignantly.
Here are the joists, in green lumber.
JL is sanding. That's all the treatment/finishing this wood beam will get.
We put the first one in by hand, since it was not as heavy as the rest. Hoisted up onto scaffolding, then lifted up and 'hung' between the cement wall and the one huge truss running through the middle of the 2nd floor.![]() |
These are hefty chunks of wood.
|
Then the remaining joists were put in place using the telehandler, in through the open roof.
| Notice the metal hangers holding joists on the right |
And then a floor was placed on top of the joists.
![]() |
| The team finished the floor despite a downpour |
![]() |
| Gotta get that roof on! (water dripping down through floor boards) |
The floor is made of 2"x12" boards laid side-by-side. Each board was given a deep groove along its length. A strip of metal inserted in the grooves adjoins and aligns the boards.