Well we're finishing the first lap here, rounding the corner full speed... M is the driver. H provides evaluation and logistics support (and, of course, brilliant suggestions and opinions). Little M provides comic relief. At the pit stop, officials from Zoning, Plans Review, and Permitting need to give us the green light before we roll on. We've turned in our drawings and are now waiting for the permit to build.
![]() | ||||
| Lumber stacked and waiting. GWNF to the right (red blaze on tree), our property downhill to the left |
Next lap "Getting Under Roof":
Breaking Ground- digging and pouring the foundation of the house
Get electricity
Gather and order materials, machines, and crews
Build walls and roof
![]() |
| Future compost bins overlooking future home site. First things first! |
Plumbing
Electrical
Well remediation
Repair the septic system
Occupancy permit
![]() |
| Sunset, looking uphill at future home site, compost bins, and national forest |
Interior walls
Counters
Wood stove
Stairs
Wood flooring
Repair the entrance to the property
Grade the driveway
![]() |
| We plan to have as much fun as we can along the way. Little M in canoe sled on future home site. |
Move in
Plant a garden!
Build a shop/barn!




2 comments:
We provide the cheering. Yay!!!!
Forgot to say that I LOVE the canoe pic. <3
Post a Comment