So we have a house on a hill with very much the doors and windows and roof in place, but it needs its guts- wiring, plumbing, everything.
 |
| The house from its best angle: the South |
|
So since we left off the story, the roof has gone on:
 |
| Beautiful work by local company. Stainless steel from sheets (M's idea and affordable!) |
 |
| And M put in North (pictured here) and South porches...from locally found materials... |
 |
| Shale and dirt will fill in around here (South side), hopefully more of a patio will be formed eventually |
 |
| Sweet girl fell asleep riding with Papa in the big Loll |
|
Today, the driveway excavation and house back-fill began with a bang...a shallow power cord was struck! So jobs which don't require electricity will continue until the driveway work and then electric repair can be done. We are also coming down to the wire (pardon the pun) on our state DOT driveway entrance permit, so we are hoping for no more obstacles!
Stay tuned for photos of the spiral staircase underway...