Here is the full first floor, walls ready to be poured next week.
Growth rings: Where there are clear seasons, growth can occur in a discrete annual or seasonal pattern, leading to growth rings; these can usually be most clearly seen on the end of a log, but are also visible on the other surfaces.
Floor Pour
![]() |
| By 7:00 a.m. the place was stirring with 4 different crews plus us! |
![]() |
| The cement mixing truck dumps into a pump truck which propels the slurry through this hose. The operator poured first a layer of walls and then the whole floor. |
![]() |
| The trowel team followed behind the cement pumper and expertly smoothed out our dance floor, and sloped it to the drains. |
![]() | |||||||||||||||||
| It took 9 workers and lots of vehicles. |
| Big M, the otter of the family, immediately saw the potential for a huge kiddie pool! |
| Toss in some foam scraps-I mean body boards- and there you have it! |
Beauty
| Mountain Laurel buds. |
| Rock-top ferns and mosses |
For me, far more than the structure being erected is the chance to live amongst these gifts, the chance to enjoy them, to wonder at and play with and tend them, and to share them with others.
| Bluets still blooming in early June! |
| Wild blue berries: ripening 2016 crop |
| Stars underfoot |
| The stream |
| Water rock revived with the rains |
| State flower of Pennsylvania: Mountain Laurel |
| Wintergreen berries: the coming 2016 crop |
| Blackberries: the coming 2016 harvest |
| Playing together in the green |
| Despite the craziness...we're better together |
| believe it or not! |
Earthly Tent
For we know that if the earthly tent we live in is destroyed, we have a building from God, an eternal house in heaven, not built by human hands. II Corinthians 5:1
It has been fun to add my part to the house by writing Scripture on the 'timbers' (so to speak).
If our hope and security rested in this existence, in our home, even the land, Hope would be very elusive...but praise YWH for the Hope planted in our hearts that has nothing to do with current circumstances.
Some inscriptions are already buried, but here are a few.
| Foundation |
| Door Frame 1 |
| Door Frame 2 |
| Door Frame 3 |
Stacks
| Stacks of ICF's. The foam, connected by plastic webs, sandwiches the concrete and insulates the walls. |
| Rebar = steel |
| Scaffolding ready for when the walls get high... |
| Foam scraps...never fear, there is a plan for these on 2nd floor. |
| In a house, water must be kept in its place. In this climate, water and breathability of a house are two major constraints that shape how we are allowed to build. |
| Here is our roof, all in 2 inches of stacked stainless steel sheets. |
| Rocks at the ready. They could be favors for guests who come to visit! |
A Radiant Slab
| We are ready for the next step: pouring a 4" slab of concrete as our first floor...but first a few shots of the 'guts' inside. |
| Looking out the south side doorway |
| A grid of rebar will provide strength and handle tension in the slab. |
Another Layer Up
| Suddenly the windows and doors appear! |
| Kitchen windows, looking west, downhill toward the road |
| One day we mistakenly had two contracters/crew at the house simultaneously- a little tight and very hot, surrounded by all that foam. They dealt graciously with the overlap. |
| Then Mark and CM and Grandaddy put the radient floor in. It will lie beneath the concrete slab floor. |
| Several loops in, more to add |
| CM gave us 2 full days of help and those days just 'happened' to be installing radiant heat system...,in which he is personally experienced! |
| Mark finds a way to work invention into any process. Voila- his homemade custom foam cutter :) Main ingredient: a hairdryer wire! |